AIRPORT- WIDE UTILITIES
In line with the expansion program at ADIA, a Utility Infrastructure Master Plan has been established which identifies the phase expansion of the new airport facilities.
Design is currently on the way for provision of the following services and construction activities are scheduled to soon follow.
- Chilled Water
- Electric Power and Distribution (including high, medium and low voltage power supply and distribution; standby power; emergency power; and uninterruptible power supply UPS)
- Telecommunication duct work for telephone and data services; electronic security and closed circuit television; fire alarm systems; air traffic control systems; building automation systems and supervisory control and data acquisition systems
- Water and Wastewater Systems which includes potable water; fire water; storm water; industrial wastes and irrigation water.
- Gas and Fuel Systems including hydrant jet fuel and Compressed Natural Gas (CNG)
|
|
|
|
|
|
|
|
|